Penmann recently finalised a tailored HVAC upgrade at Nutricia’s Liverpool-based production site, supplying a fully engineered ventilation and climate control system built to comply with demanding hygiene and production standards. The project covered the design, supply, installation and commissioning of high-specification HVAC systems across non-production, Medium Care (MC) and High https://bookmarkja.com/story23332652/the-penmann-team-finalises-specialist-hvac-installation-for-nutricia-s-production-facility-in-liverpool-in-line-with-fsi-phase-1-and-2