The ideas also include things like a major battery at the location, to make sure extra ability is often saved with the evening, and a 220 kV transmission line that will link the challenge for the North Star sub-station, close to the place a fresh 100 MW solar job is https://totalsolar.com.au/wp-content/uploads/2024/10/SeraphimSIVN-TOPcon_SRP-425.440-BTD-BG-AU.pdf