Direct costs are costs which can be directly connected with the cost item. Also, these are traceable over the project’s life cycle. Note: As the project progresses, there'll be some costs that should change or be added. Ensure that you regularly review your estimates and make the needed modifications as https://contracts-preparation-in68013.rimmablog.com/31177659/the-greatest-guide-to-dubai-consultants